Machine Trades
Page Navigation
- Machine Trades
- 1st year Area 18 Precision Machining
- MT-1 Demo Videos
- Project Prints
-
Machining Basics
- Metrology - The Science of Measurement
- Materials - Introduction
- Machinery's Handbook
- Abrasives - Bench and pedestal grinders
- Shop Math - Geometry and Trigonometry
- Threads and Threading
- Turning – Engine Lathe Basics
- Milling – Vertical and Horizontal Milling Machines Basics
- Heat Treat – Process, Testing and structure change
- Precision Grinding
- CNC Programming Basics
- CNC Turning
- CNC Milling
- CNC - Macro Programming
- EDM - Introduction
- Fasteners - Identification and applications
- Mechanical Assemblies
- Speeds and Feeds
- GD&T (Geometric Dimensioning and Tolerancing)
- Tool Identification
- General Machining Introduction
- Safety
- Shop Math - Basic Math
- Machinist Talk
- Machining Skills Task Sheets
- Northeast Indiana H.S. Machining Challenge
- Stage 02 - Task 01
- Machine Trades 2 (MT-2)
- Machine Trades How-To Videos
- My Blog
- Machine Trades 3
- My Links
- Resumes
- My Calendar
- My Homework
- My Booklist
- Machinist Group of Northeast Indiana
- How Grades are Determined
- Program Description and Statistics
- Mini-Chopper Trike
- My Message Board
- SolidEdge in Action @ South Adams
- 2014 CTE Showcase
- Flame Eater Troubleshooting
- State standards covered week 7
- State Standards Covered this week
- State standards covered
- State standards covered
- State standards covered
- State standards covered
- State standards covered
- State standards covered
- State Standards Covered
- State standards covered
- State standards covered
- State Standards Covered
- State Standards Covered
- State Standards Covered
- State Standards Covered
- State Standards Covered
- State Standards Covered
- State Standards Covered
- Flame Eater Instruction Manual
- Flame Eater Prints
- NIMS CNC Operator
- Remote Learning Demo Videos
Stage 4
-
This is the 4th Stage of the self-paced Machine Trades Class at South Adams.
You will follow the assignments in order and complete tests, assignments, projects, etc. on or before the last day of the week listed.
On the left of this page you will find links for each page of the items necessary for each week's requirements.
You may work ahead, but always make sure you work in order.
Remember: It is always easier to fall behind than to catch up!
As with everything in life.... if you have questions ASK!!
Time Frame:
Stage 4 should be completed before the end of the Second Semester of your Second year!