1st year Area 18 Precision Machining

  •  

    Project and Assignment Due Dates
    On Time To Gain full points, projects must be turned in by the last day of the week indicated, for example, the week of Thanksgiving, everything would be due on Wednesday!
    1 Week Late Maximum of 90% (Example: Drill gage turned in 1 week late and I earned a 87% on the Inspection Sheet / Project Rubric I would only earn 90% of the 87% which would be 78% in the gradebook
    2 Weeks Late 80% of  Inspection Sheet & Project Rubric
    3 Weeks Late 70% of  Inspection Sheet & Project Rubric
    4 Weeks Late 60% of  Inspection Sheet & Project Rubric
    5 Weeks Late 50% of  Inspection Sheet & Project Rubric
    6 Weeks Late 40% of  Inspection Sheet & Project Rubric
    7 Weeks Late 30% of  Inspection Sheet & Project Rubric
    8 Weeks Late 20% of  Inspection Sheet & Project Rubric
    9 Weeks Late 10% of  Inspection Sheet & Project Rubric
    More than 10 Zero on Project / Assignment
     
    Abbreviations: (MTP) = Machine Tool Practices 8th edition (Blue Textbook)
    (MH) = Machinery’s Handbook 29th edition (Black/Gold textbook)
     
    Assignments with ** MUST be turned in on time.
    Each Project or Assignment MUST be completed in order even if you receive a "Zero" on a previous project